![Fusible Main Switch Modules Fusible Main Switch Modules](https://camelin.io/wp-content/uploads/2017/01/Metermod-III_Fusible.gif)
Fusible Main Switch Modules
When greater than six branch circuits are required, the NEC requires a main disconnect and overcurrent protection device ahead of the meters. A Fusible Main […]
When greater than six branch circuits are required, the NEC requires a main disconnect and overcurrent protection device ahead of the meters. A Fusible Main […]
A Main Switch Module with Integral Pull Box provides a separate pull box compartment, independent of the main switch section, for the utility to terminate […]
Copyright © 2025